Dates function

Excel DAYS function

DAYS returns the number of days between two dates. Use it to measure how long a task took, how many days an order took to ship, or how long until a launch.

=DAYS(end_date, start_date)

Arguments

end_date
The later date. It comes first.
start_date
The earlier date.

DAYS examples

Every result below was calculated from this sample sheet by the same spreadsheet engine the Cellwise app uses.

ABC
1TaskStartFinish
2Site survey2026-11-022026-11-06
3Design2026-11-092026-12-18
4Build2026-12-212027-03-31
  1. =DAYS(C3,B3)

    Result: 39

    The design phase ran for 39 days.

  2. =DAYS(C4,B2)

    Result: 149

    From the first start to the last finish, the whole project spans 149 days.

  3. =DAYS(B3,C3)

    Result: -39

    Swap the order and you get a negative number: -39.

  4. =DAYS(C4,TODAY())

    Result: today’s date-based value (it changes every day)

    Days from today until the build finishes. It counts down each day.

How to use DAYS

  1. Click the cell for the result.
  2. Type =DAYS( and click the later date first.
  3. Type a comma and click the earlier date.
  4. Press Enter.

Common DAYS mistakes

Putting the start date first

DAYS takes the end date first. Reversed dates give a negative number.

Expecting it to count both days

DAYS counts the gap, so Monday to Friday is 4. Add 1 if you need both ends included.

Wanting working days only

DAYS counts weekends too. Use NETWORKDAYS for Monday to Friday only.

DAYS FAQ

How do I calculate the number of days between two dates in Excel?

Use =DAYS(end,start), or simply subtract: =C2-B2. Both give the same number of days.

How do I count only business days between two dates?

Use NETWORKDAYS. It skips Saturdays and Sundays and can skip a list of holidays.

Why does my days-between formula show a date?

The result cell has a date format. Change it to General or Number.